Engineering notes from the floor.
Operational write-ups, build posts and post-incident summaries — written by the engineers who run the facility and the fabric, not by marketing.
Latest from DFDC.
Introducing BareFABRIC: a fourteen-facility metro fabric, included on every port
BareFABRIC is live. Fourteen facilities, five product surfaces, one API. Every BareFABRIC Port at THG1 ships included — no per-port peering uplift, no metro hand-off markup.
ReadMore from DFDC.
DFIP launches with Frys-IX as the first internet exchange aboard
The Data Facilities Internet exchange Program is open. Frys-IX is the first internet exchange to take a position, bringing the northern Dutch…
ReadIn the lab: how we designed THG1 Phase 1
An engineering note on the design choices behind THG1 Phase 1 — distributed 2N+1, four generators, six fiber routes, VRKI 2.0 Class…
ReadAudit complete: SOC 2 Type II issued, ISO 9001 and 27001 renewed
Three-year renewal of ISO 9001:2015 and ISO 27001:2022 was completed in August 2025; the SOC 2 Type II attestation window closed in…
ReadMilestone reached: 1.75 MW of new capacity now online at DFDC The Hague
As of April 9 we have brought the first 1.75 MW of additional power online — a key step in our 3.5…
ReadLooking ahead: our 3.5 MW expansion plan
In September 2024 we announced a 3.5 MW infrastructure expansion at our Netherlands-based data center. A look at the progress and what…
ReadWant these in your inbox?
New posts as they go live. Engineer-written, no marketing fluff. Drop us a line and we will add you to the list.