[ The Hague · Power ]

3.5 MW gross. Distributed 2N+1 throughout.

Phase 1 (1.75 MW) is built and live. Phase 2 adds another 1.75 MW, scheduled for completion in 2027. Four diesel generators, three UPS clusters, three ATSes — distributed 2N+1 from the utility hand-off to the cabinet.

Total
0.0 MW
Built
0.00 MW
Generators
0
ATS / UPS
3 / 3
[ Topology ]

Distributed 2N+1, end-to-end.

Power delivery at THG1 is engineered around two facts: redundancy is only useful if it survives a real fault, and a generator without a fuel supply is just stationary plant.

The electrical and mechanical design is distributed 2N+1 throughout. Every dependency has a backup, every backup has its own backup. No single fault path takes down a customer load. Cabinet feeds are diverse A+B, sourced from independent boards.

Generators are drilled monthly. UPS modules are hot-swappable and stocked on-site. ATS hand-overs are tested under load on a documented schedule.

Diesel generator at THG1
One of four diesel generators — four-hour refueling SLA.
[ The build ]

What sits on the floor.

Generation, conditioning, transfer and distribution — each layer has its own redundancy class.

Diesel generators

Four on-site diesel generators with refueling contract on a four-hour delivery SLA. Drilled monthly; logs available on request.

UPS clusters

Three independent UPS clusters, hot-swappable battery modules. Battery banks stocked on-site — no off-site retrieval delay.

ATSes

Three automatic transfer switches hand utility-to-genset cleanly under load. Tested on a documented schedule.

A+B feeds

Diverse A+B feeds at every cabinet, sourced from independent boards. Same redundancy topology for quarter cabinets and full racks.

Metered

Cabinet-level metering across the floor. Customers see their actual draw on the BareFABRIC portal.

Audited

Power topology audited under the same compliance cycle as the rest of the facility. SOC 2 Type II evidence available under NDA.

[ Capacity ]

3.5 MW Total Build. Phase 2 in 2027.

Phase 1 (1.75 MW) is built and live today. Phase 2 adds another 1.75 MW, scheduled for completion in 2027.

Capacity reservations are available against the Phase 2 build for customers planning multi-year deployments. Reach out for the reservation terms and the build timeline.

[ Reserve ]

Reserve capacity against the Phase 2 build.

Send your power profile and target deployment window. We come back with reservation terms and an install timeline.