[ DFIP ]

Land your network at THG1. Three years of space and power, included.

The Data Facilities Interconnect Program funds 36 months of space and power for qualifying networks. Two BareFABRIC Ports included. DFIX peering from day one. Reviewed by an engineer, not by spreadsheet.

Free space + power
0 months
Free 10 G ports
0
Peering
DFIX from day 1
Review
0 business days
[ Why we do it ]

Density compounds. We invest in it deliberately.

BareFABRIC delivers value in proportion to the networks already present. DFIP is the programme that builds that density on a deliberate, audited basis.

Every operator that lands at THG1 makes the facility more attractive to the next ASN — and the operators who recognise that compounding effect are the ones already running serious networks. We fund the runway up front because density is what turns a building into a market.

This is not a promotional offer. It is a structural investment in our own facility, governed by an eligibility review that protects the value of every member network.

DFIP cabinet aisle at THG1
DFIP tenants land here — quarter cabinet (Standard) or full rack (Premium).
[ Two tiers ]

Pick the tier that fits your network.

Standard for ASNs landing on the metro. Premium for Tier-1s and global eyeball networks.

Standard tier

Quarter cabinet, 1 kW power inclusion. Two free 10 G BareFABRIC Ports — one at THG1, one at any other fabric facility. DFIX peering from day one. 36 months covered.

Premium tier

Full rack, 5 kW power inclusion. For Tier-1 transit-frees, global content origins and major eyeball networks. Two free 10 G BareFABRIC Ports + DFIX peering. 36 months covered.

[ Eligibility ]

Reviewed by an engineer, not a spreadsheet.

Eligibility is determined by review rather than by traffic threshold. We look for operationally serious networks; hobbyist deployments, home labs and stub ASes do not qualify.

Typical accepted profiles include Tier-2 NSPs, Tier-1 transit-frees, CDN edges, content origins, gaming infrastructure operators and engineering-led MSPs. Send your ASN, route policy and operational summary; we respond within five business days.

[ Apply ]

Apply to DFIP.

Send your ASN, the tier you are applying for and a short note on what you run. We review within five business days and respond with a contract or a clear decline.